84th & Bluff Substation Grading
Sector: Manufacturing (Industrial) • Location: Lincoln, Nebraska, United States of America
Source: Dodge
The scope of work includes stripping the vegetation and top six inches of topsoil in the designated areas, backfilling, and crushed rock surfacing of substation pad as shown on the associated drawings. The contractor will also be responsible for procuring all associated materials. The north side of the substation involves stripping and backfilling the 75 feet north of the existing fence for a subs
- Status
- Closed
- Sector
- Manufacturing (Industrial), Government, Consumer Products, Commercial
- Location
- Lincoln, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 84th & Bluff Substation Grading
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes stripping the vegetation and top six inches of topsoil in the designated areas, backfilling, and crushed rock surfacing of substation pad as shown on the associated drawings. The contractor will also be responsible for procuring all associated materials. The north side of the substation involves stripping and backfilling the 75 feet north of the existing fence for a substation expansion |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Lincoln |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Government, Consumer Products, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
