logo

88th Street NE Water Main Replacement Phase 2

Sector: Waste Processing and Treatment • Location: Marysville, Washington, United States of America

Source: Dodge

Project
Pre-Design

Phase 2 of the 88th St NE Corridor Widening is planned to follow Phase 1 contingent upon funding. It will be replaced with 12-inch ductile iron pipe. City of Marysville maybe seeking Design for Phase 2 of the 88th St NE Corridor Widening is planned to follow Phase 1 contingent upon funding. It will be replaced with 12-inch ductile iron pipe.

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Road, Metal, Commercial, Government, Steel
Location
Marysville, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 88th Street NE Water Main Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “88th Street NE Water Main Replacement Phase 2” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Marysville, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 2 of the 88th St NE Corridor Widening is planned to follow Phase 1 contingent upon funding. It will be replaced with 12-inch ductile iron pipe. City of Marysville maybe seeking Design for Phase 2 of the 88th St NE Corridor Widening is planned to follow Phase 1 contingent upon funding. It will be replaced with 12-inch ductile iron pipe.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Marysville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Road, Metal, Commercial, Government, Steel

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project