logo
ProjectClosed

8th Ave Basin Phase 4 CDBG

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Dodge USA

8th Avenue Phase 4 CDBG Project Project consists of The project consists of the installation of approximately 7,736 LF of PVC sanitary sewer piping, 2,539 LF of RCP, 650 LF of 2 inch forcemain, a pumpstation, 605 LF of curb and gutter, 4,750 LF of asphalt and concrete work, 82 structures, 15 curb inlets, various 4 inch and 6 inch taps, 489 LF of 24 welded steel casing by jack and bore to meet GDOT

Status
Closed
Sector
Water Supply and Storage, Cement, Rail, Road, Waste Processing and Treatment, Steel, Government, Metal, Commercial
Location
Albany, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 8th Ave Basin Phase 4 CDBG

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “8th Ave Basin Phase 4 CDBG” is an infrastructure initiative in the Water Supply and Storage sector, located in Albany, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

8th Avenue Phase 4 CDBG Project Project consists of The project consists of the installation of approximately 7,736 LF of PVC sanitary sewer piping, 2,539 LF of RCP, 650 LF of 2 inch forcemain, a pumpstation, 605 LF of curb and gutter, 4,750 LF of asphalt and concrete work, 82 structures, 15 curb inlets, various 4 inch and 6 inch taps, 489 LF of 24 welded steel casing by jack and bore to meet GDOT and Norfolk Southern Railroad specifications, and various related items to include erosion and s...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Albany

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Rail, Road, Waste Processing and Treatment, Steel, Government, Metal, Commercial

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project