logo
ProjectFinancial Close

900 MW Arun-3 Hydropower PPP Project

The status, timeline and source of this project. A free account opens every field.

Source: InfraPPPWorld

Located in Sankhuwasabha district, Arun III project is a 900 MW, export-oriented Peaking Run-of-River (PRoR) project with 3.65 hours minimum peaking capacity. The project is a high head, run of the river scheme with storage capacity envisaged for installation of four Vertical Francis generating units of 225 MW each giving a total installed capacity of 900 MW. The design energy per year is 3685 GWh

Status
Closed
Sector
Power Generation (CCGT), Water Supply and Storage, Government, Tunnel, Hydro
Location
Nepal
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about 900 MW Arun-3 Hydropower PPP Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “900 MW Arun-3 Hydropower PPP Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nepal. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Company

Status

Original status

financial close

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Located in Sankhuwasabha district, Arun III project is a 900 MW, export-oriented Peaking Run-of-River (PRoR) project with 3.65 hours minimum peaking capacity. The project is a high head, run of the river scheme with storage capacity envisaged for installation of four Vertical Francis generating units of 225 MW each giving a total installed capacity of 900 MW. The design energy per year is 3685 GWh and a total of 4012 MU annually. A 70 meter high gravity dam will be constructed from which water will be diverted into 11.74 km Head Race Tunnel. The evacuation of power will be through two 400 KV circuit of 310 km length to be connected with Indian grid at Muzaffarpur.

Original sector

Energy

Procurement method

Budget

Location

Country

Nepal

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Government, Tunnel, Hydro

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project