900 MW Wind Energy Project
Sector: Solar • Location: Anantapur, Andhra Pradesh, India
Source: Saur Energy International
NTPC REL has issued a tender for the Balance of System (BoS) package of a 900 MW wind energy project located in Anantapur, Andhra Pradesh. The project involves detailed EPC activities and requires bidders to ensure compatibility with various wind turbine generator sizes.
- Status
- Prospective
- Sector
- Solar, Wind
- Location
- Anantapur, Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy International
ConstructChat
Ask ConstructChat about 900 MW Wind Energy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NTPC REL has issued a tender for the Balance of System (BoS) package of a 900 MW wind energy project located in Anantapur, Andhra Pradesh. The project involves detailed EPC activities and requires bidders to ensure compatibility with various wind turbine generator sizes. |
Original sector | Renewable Energy |
Location
Country | India |
State | Andhra Pradesh |
City | Anantapur |
Source
Source | Saur Energy International |
URL |
More Details
Record type | Project |
Sector | Solar, Wind |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
