915 8th St River Highlands / Gold Village water Impr Ph 2
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
The work consists of construction of a redundant municipal groundwater supply well along Hammonton Smartsville Road located in Yuba County. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial
- Location
- Marysville, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 915 8th St River Highlands / Gold Village water Impr Ph 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of construction of a redundant municipal groundwater supply well along Hammonton Smartsville Road located in Yuba County. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Marysville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
