915 Bryant Mixed Use Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The 71-foot tall structure will yield 14,800 square feet, including 790 square feet for retail, from the 2,470 square foot parcel. Parking will be included for five cars in the basement garage, accessible with an automated lift. The ground level will include a lobby, gallery, and retail space in the rear.
- Status
- Prospective
- Sector
- Car parking, Automotive, Residential, Commercial, Manufacturing (Industrial), Cement
- Location
- San Francisco, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 915 Bryant Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 71-foot tall structure will yield 14,800 square feet, including 790 square feet for retail, from the 2,470 square foot parcel. Parking will be included for five cars in the basement garage, accessible with an automated lift. The ground level will include a lobby, gallery, and retail space in the rear. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Residential, Commercial, Manufacturing (Industrial), Cement |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
