logo
ProjectBidding

93rd Ave Water Main Improvements Project

Sector: Water Supply and Storage • Location: Maple Grove, Minnesota, United States of America

Source: Dodge

In general, the work consists of the following approximate quantities: 800 LF 24 Watermain, HDD 180 LF 6 24 Watermain, Open Cut 30 LF 27 Storm Sewer 420 CY Common Excavation (EV) 120 CY Aggregate Base, Class 5 (CV) 380 CY Select Granular Borrow (CV) 430 SY Geotextile Fabric, Type V, Non-Woven 120 LF Concrete Curb and Gutter 30 SY Concrete Walk 440 SY Bituminous Pavement (3 Lifts) 60 SY Bituminous

Status
Prospective
Sector
Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Electric Vehicles (EVs), Waste Processing and Treatment, Cement, Government, Power Generation (CCGT), Automotive
Location
Maple Grove, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 93rd Ave Water Main Improvements Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “93rd Ave Water Main Improvements Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Maple Grove, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In general, the work consists of the following approximate quantities: 800 LF 24 Watermain, HDD 180 LF 6 24 Watermain, Open Cut 30 LF 27 Storm Sewer 420 CY Common Excavation (EV) 120 CY Aggregate Base, Class 5 (CV) 380 CY Select Granular Borrow (CV) 430 SY Geotextile Fabric, Type V, Non-Woven 120 LF Concrete Curb and Gutter 30 SY Concrete Walk 440 SY Bituminous Pavement (3 Lifts) 60 SY Bituminous Trail Along with traffic control, temporary water service, fittings, erosion control, landscape r...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Maple Grove

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Electric Vehicles (EVs), Waste Processing and Treatment, Cement, Government, Power Generation (CCGT), Automotive

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project