949 Hope Tower/Mixed Use
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The project, an approximately 27-story tower, would replace a three-story plaster office building at 949 S. Hope Street, directly across from Grand Hope Park. Plans call for 236 apartments within thebuilding, as well as approximately 6,700 square feet of ground-floor retail space. 179 parking spaces
- Status
- Prospective
- Sector
- Commercial, Car parking, Consumer Products, Residential, Road, Automotive, Steel, Manufacturing (Industrial)
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 949 Hope Tower/Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project, an approximately 27-story tower, would replace a three-story plaster office building at 949 S. Hope Street, directly across from Grand Hope Park. Plans call for 236 apartments within thebuilding, as well as approximately 6,700 square feet of ground-floor retail space. 179 parking spaces |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Consumer Products, Residential, Road, Automotive, Steel, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
