logo
ProjectBid Results

94th Ave Resurfacing

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

This project shall include the street resurfacing consisting of grinding, resurfacing with binder and surface courses, pavement patching, curb and gutter R&R, Sidewalk R&R and detectable warnings, drainage structure adjusts and reconstructs, detector loop replacements, maintenance of traffic signals during construction and necessary restoration as directed by the Engineer. Project Location: 94th A

Status
Closed
Sector
Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
Location
Tinley Park, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 94th Ave Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “94th Ave Resurfacing” is an infrastructure initiative in the Water Supply and Storage sector, located in Tinley Park, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project shall include the street resurfacing consisting of grinding, resurfacing with binder and surface courses, pavement patching, curb and gutter R&R, Sidewalk R&R and detectable warnings, drainage structure adjusts and reconstructs, detector loop replacements, maintenance of traffic signals during construction and necessary restoration as directed by the Engineer. Project Location: 94th Avenue - 183rd Street to 171st Street

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Tinley Park

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project