logo

95 Express

Sector: Automotive • Location: Florida, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

95 Express runs approximately 21 miles from SR 836 (Dolphin Expressway) / I-395 near downtown Miami to Broward Boulevard near Fort Lauderdale. The express lanes are converted HOV lanes that allow single occupancy vehicles (SOVs) to use the lanes for a dynamically priced toll. The tolls are priced to maintain a minimum 45 mph speed in the express lanes. Project development entailed two phases.

Project Information FAQ

Project Information

5 Q
The project “95 Express” is an infrastructure initiative in the Automotive sector, located in Florida, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

95 Express runs approximately 21 miles from SR 836 (Dolphin Expressway) / I-395 near downtown Miami to Broward Boulevard near Fort Lauderdale. The express lanes are converted HOV lanes that allow single occupancy vehicles (SOVs) to use the lanes for a dynamically priced toll. The tolls are priced to maintain a minimum 45 mph speed in the express lanes. Project development entailed two phases. Phase 1, delivered as a design-build-finance project, consisted of two components. Phase 1A, open in December 2008, included work on the seven-mile northbound travel lanes from south of SR 112 / I-195 to the Golden Glades Interchange with Florida's Turnpike north of 151st Street. The project included re-striping the northbound lanes to create two express lanes and four regular travel lanes, and installing electronic signage and tolling equipment in those lanes. Phase 1B, open in January 2010, included construction of the equivalent southbound express lanes along I-95 from Florida's Turnpike to north of SR 836. The project included re-striping southbound lanes to create two express lanes and four regular travel lanes, and installing electronic signage and tolling equipment. Phase 2, delivered as a design-build project between late 2011 and October 2016, extended the express lanes in both directions between Florida's Turnpike and Broward Boulevard by converting the existing HOV lanes into two express lanes in each direction. Project work also included ITS component installation, modification of the Ives Dairy Road interchange, bridge widening at several locations, and installing new noise walls. Passenger vehicles and express transit services have access to the express lanes, but they are closed to trucks of three or more axles, which must use the regular lanes. FDOT also plans to implement a Phase 3 in segments, extending the express lanes 29 miles north to Linton Boulevard in Palm Beach County and making a direct connection with the east-west 595 Express near the Phase 2 terminus. The first segment of Phase 3 began construction in mid-2016 and is anticipated to be complete in late 2019. Additional segments will be constructed between 2018 and 2023.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data