logo
ProjectClosed

96-Inch Diameter Host Pipe at Rivieraboulevard

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

This project is for the installation of a 78.74 OD HDPE pipe-liner with fused joints inside of an existing 96-inch CAMP host pipe at University Drive and Riviera Boulevard, Miramar, FL. There is no charge for the Project Documents. There is no set budget. A Bid Bond and a Performance and Payment Bond will be required.

Status
Closed
Sector
Water Supply and Storage, Cable car, Education, Waste Processing and Treatment, Government, Automotive, Commercial, Telecommunications
Location
Miramar, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 96-Inch Diameter Host Pipe at Rivieraboulevard

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “96-Inch Diameter Host Pipe at Rivieraboulevard” is an infrastructure initiative in the Water Supply and Storage sector, located in Miramar, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is for the installation of a 78.74 OD HDPE pipe-liner with fused joints inside of an existing 96-inch CAMP host pipe at University Drive and Riviera Boulevard, Miramar, FL. There is no charge for the Project Documents. There is no set budget. A Bid Bond and a Performance and Payment Bond will be required.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Miramar

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cable car, Education, Waste Processing and Treatment, Government, Automotive, Commercial, Telecommunications

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project