96 Industrial Ct - Vanderveer Industrial Park Warehouse #5
One of 10,000+ projects Taiyo tracks in New Jersey.
Source: Dodge USA
94526 sf warehouse/office building which will consist of 90350 sf of warehouse space and one 4176 sf office space - 11 loading dock spaces plus two (2) additional drive in ramps in the rear of the building as well as 33 total passenger vehicle parking spaces (2 of which are electric vehicle charging stations. Additional improvements within the site consist of landscaping, lighting and the installa
- Status
- Prospective
- Sector
- Automotive, Electric Vehicles (EVs), Warehouse, Car parking, Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Cement
- Location
- Howell Township, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 96 Industrial Ct - Vanderveer Industrial Park Warehouse #5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 94526 sf warehouse/office building which will consist of 90350 sf of warehouse space and one 4176 sf office space - 11 loading dock spaces plus two (2) additional drive in ramps in the rear of the building as well as 33 total passenger vehicle parking spaces (2 of which are electric vehicle charging stations. Additional improvements within the site consist of landscaping, lighting and the installation of three (3) trash enclosures |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Howell Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Warehouse, Car parking, Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Cement |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
