967 Sidewalk Gaps Improvements (1626 - Downtown)
Sector: Water Supply and Storage • Location: Buda, Texas, United States of America
Source: Dodge
Sidewalk gaps on 967 between 1626 and Downtown are identified on the map below. The cost estimate to complete construction (including design and drainage) of Sections 3-8 is approximately $5 million. A funding source has not been identified; however, the project can be phased through development, sidewalk fee-in-lieu funds, grant funds, and/or future bonds. City of Buda maybe seeking Design/Engine
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Car parking, Commercial, Automotive, Cable car, Telecommunications, Government
- Location
- Buda, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 967 Sidewalk Gaps Improvements (1626 - Downtown)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sidewalk gaps on 967 between 1626 and Downtown are identified on the map below. The cost estimate to complete construction (including design and drainage) of Sections 3-8 is approximately $5 million. A funding source has not been identified; however, the project can be phased through development, sidewalk fee-in-lieu funds, grant funds, and/or future bonds. City of Buda maybe seeking Design/Engineering for Sidewalk gaps on 967 between 1626 and Downtown are identified on the map below. The cos... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Buda |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Car parking, Commercial, Automotive, Cable car, Telecommunications, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
