logo
ProjectPlanned

99MW Bitcoin Mining Project

Planned · Alberta · Last reported Feb 2025

Source: Data Center Dynamics

Bitdeer Technologies Group has acquired a 101MW gas-fired power project in Alberta to develop a 99MW Bitcoin mining operation. The project includes all necessary permits and licenses for constructing a natural gas power plant and has the potential to scale to 1GW.

Status
Prospective
Sector
Data Center, Power Generation (CCGT), Natural Gas
Location
Fox Creek, Alberta, Canada
Updated
22 Jul 2026
Source
Data Center Dynamics

ConstructChat

Ask ConstructChat about 99MW Bitcoin Mining Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “99MW Bitcoin Mining Project” is an infrastructure initiative in the Data Center sector, located in Fox Creek, Alberta, Canada. Taiyo aggregates data on it from Data Center Dynamics.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bitdeer Technologies Group has acquired a 101MW gas-fired power project in Alberta to develop a 99MW Bitcoin mining operation. The project includes all necessary permits and licenses for constructing a natural gas power plant and has the potential to scale to 1GW.

Original sector

Energy

Budget

Location

Country

Canada

State

Alberta

City

Fox Creek

Source

Source

Data Center Dynamics

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Natural Gas

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project