9C Trunk Sewer Rehabilitation Phase II
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The project will rehabilitate approximately 13,082 feet of existing 20-inch diameter non-reinforced concrete (NRCP) on the Joint Outfall Unit 9C Trunk Sewer with cured-in-place pipe liner, 13 manholes with a protective coating system, install 6 new manholes, and all appurtenant work.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Commercial, Waste Processing and Treatment
- Location
- Whittier, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 9C Trunk Sewer Rehabilitation Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate approximately 13,082 feet of existing 20-inch diameter non-reinforced concrete (NRCP) on the Joint Outfall Unit 9C Trunk Sewer with cured-in-place pipe liner, 13 manholes with a protective coating system, install 6 new manholes, and all appurtenant work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Whittier |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project