9th Pl & 2nd Drive Trunk Main Reconstruction
Sector: Waste Processing and Treatment • Location: Austin, Minnesota, United States of America
Source: Dodge
The City of Austin has a sanitary sewer trunk main on 9th Place and 2nd Drive leading to the Wastewater treatment plant. The trunk main is nearly 100 years old and is in need of repair. The scope of work would be to reconstruction the 40" sanitary sewer main and manholes. Lining for large diameter sewers (36"-40") is estimated at $500 per linear foot. With this project we have estimated about 3,10
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Austin, Minnesota, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 9th Pl & 2nd Drive Trunk Main Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The City of Austin has a sanitary sewer trunk main on 9th Place and 2nd Drive leading to the Wastewater treatment plant. The trunk main is nearly 100 years old and is in need of repair. The scope of work would be to reconstruction the 40" sanitary sewer main and manholes. Lining for large diameter sewers (36"-40") is estimated at $500 per linear foot. With this project we have estimated about 3,100 linear foot of sewer pipe. The estimated cost of the project is $2,000,000 and would be paid fo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Austin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
