9th,10th,11th and Halsell Streets Sidewalk Improvements
Sector: Car parking • Location: Bridgeport, Texas, United States of America
Source: Dodge
The project consists of furnishing all labor, equipment, and materials (except as otherwise specified), and performing all work necessary for the sidewalk improvements of the following: approximately 3,800 SF of sidewalk, ramps with handrails, and steps. This includes reconstruction of asphalt and concrete pavement repair, driveway, and concrete curb and gutter reconstruction. Bids will be receive
- Status
- Closed
- Sector
- Car parking, Commercial, Automotive, Government, Cement, Road, Manufacturing (Industrial)
- Location
- Bridgeport, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 9th,10th,11th and Halsell Streets Sidewalk Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of furnishing all labor, equipment, and materials (except as otherwise specified), and performing all work necessary for the sidewalk improvements of the following: approximately 3,800 SF of sidewalk, ramps with handrails, and steps. This includes reconstruction of asphalt and concrete pavement repair, driveway, and concrete curb and gutter reconstruction. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive al... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Bridgeport |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Government, Cement, Road, Manufacturing (Industrial) |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
