A 23 - Beira Interior Highway (Scutvias) PPP
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The concession involves the build and operation under a shadow-toll system of the dual-carriageway between Abrantes and Guarda. The road has a total length of 198 km, of which 95 km correspond to a pre-existing road and 103 km has been newly built.The concession is for a period of 30 years and includes the operation of three service stations. In operation since 2005, the road has an average daily
- Status
- Under Construction
- Sector
- Road, Automotive, Government
- Location
- Portugal
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about A 23 - Beira Interior Highway (Scutvias) PPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | project in operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The concession involves the build and operation under a shadow-toll system of the dual-carriageway between Abrantes and Guarda. The road has a total length of 198 km, of which 95 km correspond to a pre-existing road and 103 km has been newly built.The concession is for a period of 30 years and includes the operation of three service stations. In operation since 2005, the road has an average daily traffic of 5,757 vehicles. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Portugal |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road, Automotive, Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
