logo
ProjectClosed

A-28 Substation Preventative Maintenance

Closed · Nebraska · Last reported Sep 2024

Source: Dodge USA

preventative maintenance on A-28 Substation at the Theresa Street Water Resource Recovery Facility, 2400 Theresa Street, Lincoln NE, 68521. SCOPE OF WORK FOR SUBSTATION MAINTENANCE: Phase 1: At the South old substation building and after Owner personnel have unloaded all the breakers and opened them, Contractor will open cross over pullouts from North electrical grid-work to South transformer. Thi

Status
Closed
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Road, Government, Power Transmission
Location
Lincoln, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about A-28 Substation Preventative Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “A-28 Substation Preventative Maintenance” is an infrastructure initiative in the Water Supply and Storage sector, located in Lincoln, Nebraska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

preventative maintenance on A-28 Substation at the Theresa Street Water Resource Recovery Facility, 2400 Theresa Street, Lincoln NE, 68521. SCOPE OF WORK FOR SUBSTATION MAINTENANCE: Phase 1: At the South old substation building and after Owner personnel have unloaded all the breakers and opened them, Contractor will open cross over pullouts from North electrical grid-work to South transformer. This will de-energize South transformer. Contractor will then roll out every breaker in the South su...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Lincoln

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Road, Government, Power Transmission

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project