logo
ProjectEnded

A Novel, Comprehensible, Ultra-Fast, Security-Aware CPS Simulator

Sector: Power Generation (CCGT) • Location: Greece, Italy, United Kingdom, Spain, Hungary, Sweden

Source: EU Funding & Tenders Portal

One of the main problems the CPS designers face is “the lack of simulation tools and models for system design and analysis”. This is mainly because the majority of the existing simulation tools for complex CPS handle efficiently only parts of a system while they mainly focus on the performance. Moreover, they require extreme amounts of processing resources and computation time to accurately simula

Status
Closed
Sector
Power Generation (CCGT), Advanced Electronics
Location
Greece, Italy, United Kingdom, Spain, Hungary, Sweden
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about A Novel, Comprehensible, Ultra-Fast, Security-Aware CPS Simulator

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “A Novel, Comprehensible, Ultra-Fast, Security-Aware CPS Simulator” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Greece, Italy, United Kingdom, Spain, Hungary, Sweden. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

One of the main problems the CPS designers face is “the lack of simulation tools and models for system design and analysis”. This is mainly because the majority of the existing simulation tools for complex CPS handle efficiently only parts of a system while they mainly focus on the performance. Moreover, they require extreme amounts of processing resources and computation time to accurately simulate the CPS nodes’ processing. Faster approaches are available, however as they function at high levels of abstraction, they cannot provide the accuracy required to model the exact behavior of the system under design so as to guarantee that it meets the requirements in terms of performance and/or energy consumption. The COSSIM project will address all those needs by providing an open-source framework which will a) seamlessly simulate, in an integrated way, both the networking and the processing parts of the CPS, b) perform the simulations orders of magnitude faster, c) provide much more accurate results especially in terms of power consumption than existing solutions, d) report more CPS aspects than any existing tool including the underlying security of the CPS. COSSIM will achieve the above by developing a novel simulator framework based on a processing simulation sub-system (i.e. a “full-system simulator”) which will be integrated with a novel network simulator. Furthermore, innovative power consumption and security measurement models will be developed and incorporated to the end framework. On top of that, COSSIM will also address another critical aspect of an accurate CPS simulation environment: the performance as measured in required simulation time. COSSIM will create a framework that is orders of magnitude faster, while also being more accurate and reporting more CPS aspects, than existing solutions, by applying hardware acceleration through the use of field programmable gate arrays (FPGAs), which have been proven extremely efficient in relevant tasks.

Location

Country

Greece, Italy, United Kingdom, Spain, Hungary, Sweden

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Advanced Electronics

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project