logo
ProjectUnder Construction

A1/B2 Transmission Line Project

The owner, status and timeline of this project. A free account opens every field.

Source: Greenfield Recorder

A multi-year, $470 million project by National Grid to upgrade a high-voltage transmission line from Vernon, Vermont, through southeastern New Hampshire, into Franklin and Worcester counties in Massachusetts. The project involves replacing structures and foundations, adding new conductors, improving right-of-way access, and trimming vegetation. It covers upgrading more than 570 structures along a

Status
Under Construction
Sector
Power Transmission, Power Generation (CCGT)
Location
Vernon, Warwick, Royalston, Athol, Winchendon, Vermont, New Hampshire, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Greenfield Recorder

ConstructChat

Ask ConstructChat about A1/B2 Transmission Line Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “A1/B2 Transmission Line Project” is an infrastructure initiative in the Power Transmission sector, located in Vernon, Warwick, Royalston, Athol, Winchendon, Vermont, New Hampshire, Massachusetts, United States. Taiyo aggregates data on it from Greenfield Recorder.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A multi-year, $470 million project by National Grid to upgrade a high-voltage transmission line from Vernon, Vermont, through southeastern New Hampshire, into Franklin and Worcester counties in Massachusetts. The project involves replacing structures and foundations, adding new conductors, improving right-of-way access, and trimming vegetation. It covers upgrading more than 570 structures along a roughly 47-mile stretch, connecting to 6.8 miles of upgraded lines already completed. The project is phased over four years, with completion expected by late 2030.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Vermont, New Hampshire, Massachusetts

City

Vernon, Warwick, Royalston, Athol, Winchendon

Source

Source

Greenfield Recorder

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project