A2 Feeder Splicing and Repair
Sector: Water Supply and Storage • Location: Seabrook, Texas, United States of America
Source: Dodge USA
This quote is for splicing the A2 feeder in four manholes (manhole numbers 4, 8, 13, and 16) using t-body connections and re-terminating the ends at the switches (A2 and FT1). Sections of the cable may need to be tugged through the conduit to provide additional length for the splices.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Telecommunications, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Seabrook, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about A2 Feeder Splicing and Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This quote is for splicing the A2 feeder in four manholes (manhole numbers 4, 8, 13, and 16) using t-body connections and re-terminating the ends at the switches (A2 and FT1). Sections of the cable may need to be tugged through the conduit to provide additional length for the splices. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Seabrook |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Telecommunications, Commercial, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
