A24 motorway PPP project
One of 3,997 projects Taiyo tracks in Portugal.
Source: InfraPPPWorld
The A24 motorway linking the Portuguese cities of Viseuand Chaves. The 155 km link, which opens up the north of Portugal and provides ready access to Spain from the center of the country, is operated by Norscut, a 50% subsidiary of Eiffage. Because of rugged terrain along the route, 6 years of construction and no fewer than 37 engineering structures were required, the longest being the VilaPouca d
- Status
- Under Construction
- Sector
- Bridge, Road
- Location
- Portugal
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about A24 motorway PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The A24 motorway linking the Portuguese cities of Viseuand Chaves. The 155 km link, which opens up the north of Portugal and provides ready access to Spain from the center of the country, is operated by Norscut, a 50% subsidiary of Eiffage. Because of rugged terrain along the route, 6 years of construction and no fewer than 37 engineering structures were required, the longest being the VilaPouca de Aguiar viaduct with 1 350 meters. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Portugal |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
