A3 Bldg Stabilization Phase 2
Gc bidding · Missouri · Last reported Aug 2024
Source: Dodge USA
The U.S. Geological Survey Columbia Environmental Research Center (CERC) has a requirement to stabilize the southeast, southwest, and northwest corner of their A3 main building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the le
- Status
- Under Construction
- Sector
- Steel, Commercial, Metal, Manufacturing (Industrial)
- Location
- Columbia, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about A3 Bldg Stabilization Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Geological Survey Columbia Environmental Research Center (CERC) has a requirement to stabilize the southeast, southwest, and northwest corner of their A3 main building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of the southeast, southwest, northwest and basement. Cut basement slab and replace with unde... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Columbia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Metal, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
