A3 (Frankfurt-Nuremberg) six-lane expansion PPP project
One of 10,000+ projects Taiyo tracks in Germany.
Source: InfraPPPWorld
The proposed project provides for an upgrade of the A3 Frankfurt-Nuremberg motorway to three lanes in each direction in the section between kilometre 227.80, east of Kauppen Bridge, to kilometre 235.79, west of junction 64 (Rohrbrunn), making a total of 7.99 kilometres.The present motorway has two lanes in each direction and a crown width of 30 metres. In the area of the Kauppen gradient, between
- Status
- Closed
- Sector
- Bridge, Road
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about A3 (Frankfurt-Nuremberg) six-lane expansion PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project provides for an upgrade of the A3 Frankfurt-Nuremberg motorway to three lanes in each direction in the section between kilometre 227.80, east of Kauppen Bridge, to kilometre 235.79, west of junction 64 (Rohrbrunn), making a total of 7.99 kilometres.The present motorway has two lanes in each direction and a crown width of 30 metres. In the area of the Kauppen gradient, between the existing Kauppen Bridge and junction 63 (Weibersbrunn), the Frankfurt-Nuremberg carriageway currently has an extra lane instead of a hard shoulder. |
Original sector | Transport |
Procurement method |
Location
Country | Germany |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Germany
- Herren Tunnel, Lübeck
- A7 Motorway Extension
- Sustainable B2B platform for food ingredients
- HAFENINFRASTRUKTUR HAMBURG TEN
- Borkum Riffgrund 2 Offshore Wind Farm North Sea
- Merkur Offshore Wind Farm North Sea Germany
- Boehringer’s Chemical Innovation Plant, Ingelheim, Germany
- A6 WIESLOCH-RAUENBERG TO WEINSBERG PPP
