logo
ProjectClosed

AAC / Demo Working Group

Sector: Forest Products and Packaging

Source: ArchDaily

Text description provided by the architects.Atelier AC is a low-cost teaching facility and community center inAachen. Located in a public park adjacent to a school, it complements the existing functions of sports facilities, gardens, rehearsal rooms and recreational areas with a multifunctional space. In order to achieve the predetermined budget, the design was conceived as a usable shell that lea

Status
Closed
Sector
Forest Products and Packaging, Education, Power Generation (CCGT), Residential, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about AAC / Demo Working Group

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “AAC / Demo Working Group” is an infrastructure initiative in the Forest Products and Packaging sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Text description provided by the architects.Atelier AC is a low-cost teaching facility and community center inAachen. Located in a public park adjacent to a school, it complements the existing functions of sports facilities, gardens, rehearsal rooms and recreational areas with a multifunctional space. In order to achieve the predetermined budget, the design was conceived as a usable shell that leaves open possibilities for appropriation and further construction as a permanent intermediate state.Following this principle, the space-forming construction consists of BSP boards, which also form the surface of the interior spaces and are shielded from the weather by a layer of foil. The actual façade level in this structure only has the function of a consumable layer, which protects the more valuable layers underneath. The material used was BFU impregnated pine panels on battens as a substructure. Due to the simplified level of detail, the façade could be constructed by a project group of young people under professional guidance, using their own labor. The low material value and the possibility of reuse compensates the reduced life expectancy. As a temporary architecture with a provisionally envisaged duration of 5-10 years, the basic construction can be completely dismantled and reassembled at another location. Accordingly, the building is not earth-connected and is founded on screw foundations.Various items such as windows, skylights, lighting, etc. were not included in the budget and are donations from individuals and manufacturers who obtained them from their inventories. As readymades, these components were integrated into the design. The technical equipment was reduced to an absolute minimum. Since the cost and energy required for insulation seemed disproportionately high due to irregular use, the interior is warmed by a heater when needed and can cool down when not in use. The building does not have its own power connection, but is simply plugged into a nearby outdoor outlet via a power cable when in use.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Education, Power Generation (CCGT), Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project