AASHIQ Restaurant Phase 1
Closed · Washington · Last reported May 2023
Source: Dodge USA
New restaurant - first tenant in retail space (ground level) to include dining area, bar/lounge, take-out area, restrooms and kitchen (display kitchen, prep, scullery, cooler, freezer, dry storage). The scope of work to include non-bearing interior partition walls, kitchen equipment, casework, ceilings and lighting. Proposed exterior work limited to new storefront (none existing) - storefront alum
- Status
- Closed
- Sector
- Metal, Consumer Products, Steel, Raw Materials, Commercial
- Location
- Kirkland, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AASHIQ Restaurant Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New restaurant - first tenant in retail space (ground level) to include dining area, bar/lounge, take-out area, restrooms and kitchen (display kitchen, prep, scullery, cooler, freezer, dry storage). The scope of work to include non-bearing interior partition walls, kitchen equipment, casework, ceilings and lighting. Proposed exterior work limited to new storefront (none existing) - storefront aluminum frame system to be bidder-designed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Kirkland |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Consumer Products, Steel, Raw Materials, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
