logo
ProjectOperational

Aba Integrated Power Project (Aba IPP)

One of 144 projects Taiyo tracks in Abia State.

Source: THISAGE

A power generation project in Aba, Abia State, Nigeria, driven by Geometric Power, producing 188MW of electricity. It is part of efforts to stabilize and expand Nigeria's power sector.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Aba, Abia State, Nigeria
Updated
22 Jul 2026
Source
THISAGE

ConstructChat

Ask ConstructChat about Aba Integrated Power Project (Aba IPP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Aba Integrated Power Project (Aba IPP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Aba, Abia State, Nigeria. Taiyo aggregates data on it from THISAGE.

Participants

Not available for this record.

Status

Original status

operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A power generation project in Aba, Abia State, Nigeria, driven by Geometric Power, producing 188MW of electricity. It is part of efforts to stabilize and expand Nigeria's power sector.

Original sector

Energy

Location

Country

Nigeria

State

Abia State

City

Aba

Source

Source

THISAGE

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-03-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project