logo
ProjectOperational With Recent Blackout

Aba Integrated Power Project

The owner, status and timeline of this project. A free account opens every field.

Source: Businessamlive

The 188MW Aba Integrated Power Project promoted by Geometric Power is a power generation project in Aba, Nigeria. It has supplied electricity without interruption for two months until a recent blackout due to gas supply disruption. The project relies on gas supply from a joint venture operated by Heirs Energies and the Nigerian National Petroleum Company Ltd (NNPL). A new substation dedicated to t

Status
Operational with recent blackout
Sector
Oil and Gas, Power Generation (CCGT)
Location
Aba, Abia State, Nigeria
Updated
22 Jul 2026
Source
Businessamlive

ConstructChat

Ask ConstructChat about Aba Integrated Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Aba Integrated Power Project” is an infrastructure initiative in the Oil and Gas sector, located in Aba, Abia State, Nigeria. Taiyo aggregates data on it from Businessamlive.

Participants

Not available for this record.

Status

Original status

operational with recent blackout

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 188MW Aba Integrated Power Project promoted by Geometric Power is a power generation project in Aba, Nigeria. It has supplied electricity without interruption for two months until a recent blackout due to gas supply disruption. The project relies on gas supply from a joint venture operated by Heirs Energies and the Nigerian National Petroleum Company Ltd (NNPL). A new substation dedicated to the project by the Transmission Company of Nigeria (TCN) has been completed but is yet to be commissioned.

Original sector

Energy

Location

Country

Nigeria

State

Abia State

City

Aba

Source

Source

Businessamlive

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT)

Article published date

2025-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project