logo

Abbey House Restoration and Rehabilitation / Antonio Garcia Blay y Jose Antonio Ruiz Suaña

Sector: Commercial • Location: Spain

Source: ArchDaily

Project
Closed

The wall boxes of the complex are consolidated, and the deteriorated slabs are replaced by an interior structure of wooden floors and walls, which, at the same time, configure the rooms, ambiance, and finishes.Text description provided by the architects.The castle ofPortell de Morellafeatures, within its complex, the old parish house: a small domestic structure with an attached area adjacent to on

Project Information FAQ

Project Information

3 Q
The project “Abbey House Restoration and Rehabilitation / Antonio Garcia Blay y Jose Antonio Ruiz Suaña” is an infrastructure initiative in the Commercial sector, located in Spain. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The wall boxes of the complex are consolidated, and the deteriorated slabs are replaced by an interior structure of wooden floors and walls, which, at the same time, configure the rooms, ambiance, and finishes.Text description provided by the architects.The castle ofPortell de Morellafeatures, within its complex, the old parish house: a small domestic structure with an attached area adjacent to one of its towers.The exterior of the complex preserves the vernacular character and urban environment before the intervention. In the interior, work was carried out to fit out as municipal rural accommodation.Abandoned for decades, it was in a state of disrepair that required structural consolidation. Subsequently, part of the building was removed, and a courtyard was opened up to give autonomy to the tower and wall, allowing them to recover their defensive character. This courtyard provides lighting and ventilation and incorporates vertical circulation between the different levels of the building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data