ABC Distribution Warehouse Facility/Office
Sector: Steel • Location: Montgomery, Alabama, United States of America
Source: Dodge
The Work of this Project Phase 2 SITEWORK 2 includes, but is not limited to: Mass grading, Building Pad/Stone Base, and Storm Drainage - Phase 3 SHELL includes, but is not limited to: Concrete Foundation, Slab, Tilt-up Walls, Misc. Concrete, Steel, decking, joists, and roof system Construction Management firms to provide program and construction management and other construction related services f
- Status
- Prospective
- Sector
- Steel, Cement, Consumer Products, Commercial, Manufacturing (Industrial), Residential, Warehouse, Metal, Waste Processing and Treatment
- Location
- Montgomery, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ABC Distribution Warehouse Facility/Office
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work of this Project Phase 2 SITEWORK 2 includes, but is not limited to: Mass grading, Building Pad/Stone Base, and Storm Drainage - Phase 3 SHELL includes, but is not limited to: Concrete Foundation, Slab, Tilt-up Walls, Misc. Concrete, Steel, decking, joists, and roof system Construction Management firms to provide program and construction management and other construction related services for a new distribution warehouse facility/office for the State of Alabama Alcoholic Beverage Contr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Montgomery |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Consumer Products, Commercial, Manufacturing (Industrial), Residential, Warehouse, Metal, Waste Processing and Treatment |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
