Abegweit First Nation Rte 2 Highway Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The project consists of upgrades and support infrastructure along Route 2, in conjunction with a reduced speed limit which should encourage lower vehicle speeds for Route 2 traffic within the community and enhance safety for pedestrians/cyclists. Project works will include constructing raised gateway median islands (170m2) along Route 2 at each end of the community to help signal a reduced speed l
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Rail, Cement, Road
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Abegweit First Nation Rte 2 Highway Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of upgrades and support infrastructure along Route 2, in conjunction with a reduced speed limit which should encourage lower vehicle speeds for Route 2 traffic within the community and enhance safety for pedestrians/cyclists. Project works will include constructing raised gateway median islands (170m2) along Route 2 at each end of the community to help signal a reduced speed limit. This will also include related items and support infrastructure such as asphalt resurfacing (11,600m2), storm sewer (330m),concrete curb (755m), guide rail (490m), and lighting along Route 2. The project will also include replacing or upsizing of several existing culverts under roadways, driveways, and the Confederation Trail. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Rail, Cement, Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
