logo

Abengoa KaXu Solar I CSP Solar Plant

Sector: Commercial • Location: South Africa

Source: World Bank Group

Project
Active

In December 2011, a joint venture between Abengoa (MCE: ABG) of Spain and South Africa's public Industrial Development Corporation (IDC) were awarded after a tendering process the rights to construct a 100 MW concentrating solar thermal power plant to be located in the Northern Cape region. The technology was to be a solar parabolic trough. The joint venture was owned 51% by Abengoa and 49% by I

Project Information FAQ

Project Information

5 Q
The project “Abengoa KaXu Solar I CSP Solar Plant” is an infrastructure initiative in the Commercial sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2011, a joint venture between Abengoa (MCE: ABG) of Spain and South Africa's public Industrial Development Corporation (IDC) were awarded after a tendering process the rights to construct a 100 MW concentrating solar thermal power plant to be located in the Northern Cape region. The technology was to be a solar parabolic trough. The joint venture was owned 51% by Abengoa and 49% by IDC. Precise details of the PPA were not released with the announcment, with the understanding that contractual negotiations would be finalized by June, 2012. The project was awarded through a governmnet tender where the projected price of power was a significant factor in the decision made. Total project cost was estimated at USD 844 million, with expected comissioning for 2015. In December 2012, the KaXu project reached fiancial close. Full details of the transaction were not released, however the IFC did provide USD 125 million in loans from its own account and USD 25 million in loans from the CTF. Debt was provided with an 18 year tenor with the particiaption of local public banks IDC and the Development Bank of South Africa. In addition, two local commercial Banks, Nedbank and RMB Bank participated in the loan tranche. http://www.energyefficiencynews.com/articles/i/4706/ http://www.ifc.org/IFCExt/Pressroom/IFCPressRoom.nsf/0/5423D144CCE0745A42257AB40057227A http://www.prnewswire.com/news-releases/abengoa-awarded-two-csp-projects-by-south-africas-department-of-energy-135211383.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data