Abercrombie Store- Naperville, IL
Sector: Road • Location: Naperville, Illinois, United States of America
Source: Dodge USA
The project scope of work consists of a new +/- 5,470 sf ground floor abercrombie d fitch store located at the 103 s. Washington street in naperville, il. The new store will include, but not limited to nterior walls ceilings, floor finishes, fixtures, lighting and mechanical systems. The existing structure will remain unchanged and mechanical and electrical systems will be modified accordingly.
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial
- Location
- Naperville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Abercrombie Store- Naperville, IL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope of work consists of a new +/- 5,470 sf ground floor abercrombie d fitch store located at the 103 s. Washington street in naperville, il. The new store will include, but not limited to nterior walls ceilings, floor finishes, fixtures, lighting and mechanical systems. The existing structure will remain unchanged and mechanical and electrical systems will be modified accordingly. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Naperville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
