Aberjona River Flood Mitigation Program P#10
Sector: Water Supply and Storage • Location: Winchester, Massachusetts, United States of America
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for Aberjona River Flood Mitigation Program Project 10 - Muraco School Culverts. Installation of two precast culverts under the MBTA Railroad.
- Status
- Prospective
- Sector
- Water Supply and Storage, Rail, Waste Processing and Treatment, Government, Commercial
- Location
- Winchester, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Aberjona River Flood Mitigation Program P 10
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for Aberjona River Flood Mitigation Program Project 10 - Muraco School Culverts. Installation of two precast culverts under the MBTA Railroad. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Winchester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
