Abilene Vacant Unit Make Ready
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Doors and Hardware Inspect all interior and exterior doors for proper operation Tighten, repair, or replace doorknobs, stoppers, hinges, and locks Ensure privacy locks work in bathrooms and bedrooms Replace damaged or missing weather stripping 2. Windows and Screens Check all windows for proper function and secure locking mechanisms Clean tracks; replace damaged locks, balances, or cranks Replace
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Government, Commercial
- Location
- Abilene, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Abilene Vacant Unit Make Ready
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Doors and Hardware Inspect all interior and exterior doors for proper operation Tighten, repair, or replace doorknobs, stoppers, hinges, and locks Ensure privacy locks work in bathrooms and bedrooms Replace damaged or missing weather stripping 2. Windows and Screens Check all windows for proper function and secure locking mechanisms Clean tracks; replace damaged locks, balances, or cranks Replace missing or torn window screens IFB# AHA-2025-007 Vacant Unit Make Ready Page 11 of 15 3. Flooring... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Abilene |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Government, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
