logo
Project

ABN-PROGRAMME DE LUTTE CONTRE L'ENSABLEMENT

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Program to combat sand encroachment in the Niger River Basin (PLCE / ABN) is justified by the political will of the NBA Member States to provide a regional response to one of the serious problems in terms of safeguarding, protection and sustainable development of the resources of the Niger Basin. Thus conceived, the first phase of the PLCE / ABN for a period of five (5) years must respond to t

Sector
Raw Materials, Water Supply and Storage, Wind, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about ABN-PROGRAMME DE LUTTE CONTRE L'ENSABLEMENT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ABN-PROGRAMME DE LUTTE CONTRE L'ENSABLEMENT” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Program to combat sand encroachment in the Niger River Basin (PLCE / ABN) is justified by the political will of the NBA Member States to provide a regional response to one of the serious problems in terms of safeguarding, protection and sustainable development of the resources of the Niger Basin. Thus conceived, the first phase of the PLCE / ABN for a period of five (5) years must respond to the urgency to undertake major actions to fight effectively and sustainably against silting in the area most affected by silting, namely the Sahelo-Saharan triangle located in the middle Niger basin including the Niger loop in Mali, the north-east of the basin in Burkina Faso and the right bank of the river in Niger upstream from Niamey, and the need to support and strengthen the structures of the NBA at regional and national levels. The main challenge expected from this program is to halt or even reduce the phenomenon of silting and water erosion at the scale of the basin through the realization of coordinated and concerted actions of the various member countries of the NBA while strengthening the capacities of the NBA and its member countries and providing them with tools for designing and planning actions to protect against water erosion and fight against silting. To meet this challenge, the actions of the program will have to contribute: (i) strengthening the sub regional and national institutional capacities of the ANB and its Member States with a view to concerted management of the shared resources of the basin, (ii) mitigating the effects of desertification and slowing the process of silting in the Niger basin, (iii) support to NBA Member States to implement their national programs to combat silting and water and wind erosion, and (iv) strengthening the membership and involvement of local populations in the implementation of the Program.

Original sector

General Environment Protection

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Wind, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project