Aboitiz Power, through its subsidiary Hedcor, was planning the expansion of the 42.5MW Sibulan hydropower plant (#3816), with 13.6 MW by constructing the 6.6MW Tudaya-1 and 7.0MW Tudaya 2 small hydropower plants.

The projects were expected for commissioning in December 2012, although other sources claim Q1 2014. Construction started in July 2012. Tudaya 2, a run-of-river, plant, was expected to b

Status
Prospective
Sector
Hydro, Power Transmission, Power Generation (CCGT), Commercial, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Aboitiz Tudaya 1-2 SHPPs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Aboitiz Tudaya 1-2 SHPPs” is an infrastructure initiative in the Hydro sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Aboitiz Power, through its subsidiary Hedcor, was planning the expansion of the 42.5MW Sibulan hydropower plant (#3816), with 13.6 MW by constructing the 6.6MW Tudaya-1 and 7.0MW Tudaya 2 small hydropower plants. The projects were expected for commissioning in December 2012, although other sources claim Q1 2014. Construction started in July 2012. Tudaya 2, a run-of-river, plant, was expected to be completed in 2014. Construction started in August 2012. Total output was to be 76GWh annually. Output was to be supplied to the Davao del Sur Electric Cooperative, and the electric utility Davao Light and Power Company, a unit of Aboitiz. Total cost was estimated at P1.8 billion (US$42.4 million) for the Tudaya -2. The project applied for UNFCCC CDM financing. http://www.sunstar.com.ph/cagayan-de-oro/business/2012/08/05/hedcor-breaks-ground-tudaya-hydro-plant-235817 SeeNews Renewables, Hedcor to break ground on 7MW HPP in Philippines on August 1, 31 July 2012. http://www.sunstar.com.ph/davao/business/2012/07/31/7-mw-tudaya-hydro-plant-set-construction-soon-234883

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2024-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project