Aboitiz Tudaya 1-2 SHPPs
Sector: Hydro • Location: Indonesia
Source: World Bank Group
Aboitiz Power, through its subsidiary Hedcor, was planning the expansion of the 42.5MW Sibulan hydropower plant (#3816), with 13.6 MW by constructing the 6.6MW Tudaya-1 and 7.0MW Tudaya 2 small hydropower plants.
The projects were expected for commissioning in December 2012, although other sources claim Q1 2014. Construction started in July 2012. Tudaya 2, a run-of-river, plant, was expected to b
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Aboitiz Power, through its subsidiary Hedcor, was planning the expansion of the 42.5MW Sibulan hydropower plant (#3816), with 13.6 MW by constructing the 6.6MW Tudaya-1 and 7.0MW Tudaya 2 small hydropower plants. The projects were expected for commissioning in December 2012, although other sources claim Q1 2014. Construction started in July 2012. Tudaya 2, a run-of-river, plant, was expected to be completed in 2014. Construction started in August 2012. Total output was to be 76GWh annually. Output was to be supplied to the Davao del Sur Electric Cooperative, and the electric utility Davao Light and Power Company, a unit of Aboitiz. Total cost was estimated at P1.8 billion (US$42.4 million) for the Tudaya -2. The project applied for UNFCCC CDM financing. http://www.sunstar.com.ph/cagayan-de-oro/business/2012/08/05/hedcor-breaks-ground-tudaya-hydro-plant-235817 SeeNews Renewables, Hedcor to break ground on 7MW HPP in Philippines on August 1, 31 July 2012. http://www.sunstar.com.ph/davao/business/2012/07/31/7-mw-tudaya-hydro-plant-set-construction-soon-234883 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |