Abrams Park Pump Station Replacement
Sector: Water Supply and Storage • Location: Ridgefield, Washington, United States of America
Source: Dodge
Remove the existing equipment, replace the existing vacuum primed pump with a grinder pump, and replace the wet well cover with a lid that improves access. Connect to the existing 4-inch force main. New wet well top slap, pumps, valving, and electrical
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Car parking, Automotive, Government
- Location
- Ridgefield, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Abrams Park Pump Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove the existing equipment, replace the existing vacuum primed pump with a grinder pump, and replace the wet well cover with a lid that improves access. Connect to the existing 4-inch force main. New wet well top slap, pumps, valving, and electrical |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Ridgefield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Car parking, Automotive, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
