logo
ProjectPlanned

Absheron-Garadagh Wind Project

Sector: Wind • Location: Baku, Azerbaijan

Source: Mena FN

The Absheron-Garadagh wind project is a 240-megawatt wind farm in Azerbaijan. It is part of Masdar's renewable energy expansion in Azerbaijan, aiming to increase the country's renewable energy capacity. The project is at an advanced stage with preliminary work underway and full construction expected to start after financial close.

Status
Prospective
Sector
Wind, Raw Materials
Location
Baku, Azerbaijan
Updated
22 Jul 2026
Source
Mena FN

ConstructChat

Ask ConstructChat about Absheron-Garadagh Wind Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Absheron-Garadagh Wind Project” is an infrastructure initiative in the Wind sector, located in Baku, Azerbaijan. Taiyo aggregates data on it from Mena FN.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Absheron-Garadagh wind project is a 240-megawatt wind farm in Azerbaijan. It is part of Masdar's renewable energy expansion in Azerbaijan, aiming to increase the country's renewable energy capacity. The project is at an advanced stage with preliminary work underway and full construction expected to start after financial close.

Original sector

Energy

Budget

Location

Country

Azerbaijan

City

Baku

Source

Source

Mena FN

URL

More Details

Record type

Project

Sector

Wind, Raw Materials

Article published date

2026-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project