Abydos I BESS

Sector: Energy Storage • Location: Egypt, Arab Republic of

Source: International Finance Corporation (IFC)

Project
Active

The proposed investment seeks to support a 300 Mega Watt Hour (MWh) Battery Energy Storage System (BESS) expansion into the 500MW solar Photovoltaic (PV) Power plant, located in Aswan Governorate in Egypt. The 500 MW PV was financed by IFC in 2022 under Abydos Solar project (Abydos I and together with Abydos I BESS, the Project). The project will be owned and executed by AMEA Power Ltd. (“AMEA” or

Project Information FAQ

Project Information

4 Q
The project “Abydos I BESS” is an infrastructure initiative in the Energy Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed investment seeks to support a 300 Mega Watt Hour (MWh) Battery Energy Storage System (BESS) expansion into the 500MW solar Photovoltaic (PV) Power plant, located in Aswan Governorate in Egypt. The 500 MW PV was financed by IFC in 2022 under Abydos Solar project (Abydos I and together with Abydos I BESS, the Project). The project will be owned and executed by AMEA Power Ltd. (“AMEA” or “Company”). Abydos I PV was commissioned on November 29, 2024.The project will be the first BESS installed in Egypt for load shifting, allowing the dispatch of valuable Renewable Energy (RE) during peak consumption hours at night. The objective of the BESS is to store energy during the day, prioritizing grid-clipped energy, and dispatch this energy at night, when the solar PV Project would not be operational. The BESS capacity will be 100 MWh for 1-hour storage, and up to 400 MWh for 4-hour storage. It will be fully integrated within the existing Abydos I Power Purchase Agreement (PPA) and executed by the same Engineering Procurement Contractor (EPC) and financed by the same group of lenders.The project cost is estimated at US$80mm with IFC portion being a proposed (i) A Loan of US$30mm; (ii) US$19 million from IFC as implementing entity of IFC-managed blended finance programs, and (ii) interest rate swap LEQs at c. US$2mm.The project constitutes a brownfield expansion of 2,000 – 4,000 m2 (0.2 – 0.4 hectares) within the existent Abydos I project boundary. No additional land take is required. Construction activities for the BESS expansion Project are expected to start in December 2024 and be completed within 6 months.                                                   

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data