logo
ProjectPending

Abydos Solar II

One of 989 projects Taiyo tracks in Egypt, Arab Republic of.

Source: International Finance Corporation (IFC)

    The ABYDOS II project will be Egypt’s largest solar Photovoltaic (PV) power plant with a Battery Energy Storage System (BESS). The project consists of the development, construction, operation and maintenance of a 1GW solar PV power plant and 600 MWh BESS (the Project), located in Aswan Governorate, Egypt. The project will be developed on approximately 20km2 of government-owned land adjacent to

Status
Prospective
Sector
Water Supply and Storage, Cement, Solar, Waste Processing and Treatment, Energy Storage, Power Transmission, Road, Raw Materials, Warehouse, Power Generation (CCGT), Biomass, Residential, Commercial, Government
Location
Egypt
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Abydos Solar II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Abydos Solar II” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The ABYDOS II project will be Egypt’s largest solar Photovoltaic (PV) power plant with a Battery Energy Storage System (BESS). The project consists of the development, construction, operation and maintenance of a 1GW solar PV power plant and 600 MWh BESS (the Project), located in Aswan Governorate, Egypt. The project will be developed on approximately 20km2 of government-owned land adjacent to Luxor-Aswan Highway. The project is being implemented by the Abydos for Renewable Energy SAE (hereafter referred to as “AFRE”), a special purpose vehicle wholly owned by AMEA Power Ltd (hereafter referred to as “AMEA” or the “Sponsor”). Established in 2016, AMEA develops, owns, and operates renewable power projects in Africa, the Middle East and Asia. The total project cost is estimated at around US$750 million. IFC is considering a i) A Loan of up to US$120 million; and ii) US$ interest rate swaps representing an expected positive exposure of up to US$15 million. In addition, IFC is expected to mobilize up to US$480 million in the form of B and Parallel loans.The Project is also planned to comprise of i)144 Central inverter stations to convert electricity from the panels from Direct Current (DC) to Alternating Current (AC) to be connected to a substation through underground cables; ii) a substation for connection with the High Voltage National Grid (from 33kV or 22kV depending on final design to a 500kV); iii) an integrated control system and Energy Management System (EMS) for efficient BESS operation; iv) infrastructure including offices and a control building (including data, control and voice communication system); v) a warehouse; vi) a road network including internal access roads and a security perimeter road; and vii) a security fence surrounding the entire site.During the construction phase, the Project will also include storage areas, a mobile concrete batching plant and generators. There will also be an Overhead Transmission Line (OHTL) of approximately 1.6 kilometers connecting the National Grid to the Project’s substation, which will be constructed by the Egyptian Electricity Transmission Company (EETC), who are also the offtaker and grid operator. The OHTL is considered an Associated Facility (AF) as per IFC Performance Standard.  An Addendum to the project Environmental and Social Impact Assessment (ESIA), aligned with IFC Performance Standards (PS), will be developed once EETC confirms the route of the OHTL.  This is a greenfield project situated in government-owned vacant desert land about 1km east of the Luxor-Aswan Highway, allocated to the New Renewable Energy Agency (NREA) in 2017, for the development of renewable energy projects. A usufruct agreement was signed between NREA and AFRE, together with a Power Purchase Agreement (PPA) for 25 years between EETC and AFRE. No human habitation, grazing, or agriculture was observed on, or adjacent to, the site. The closest communities to the project site are Al Raqaba Foaniyeh and Al Raqaba Tahtaniyeh in the Aswan Governorate, which are located approximately 6.5 kilometers away. The construction phase is anticipated to take about 17 months. The Equipment, Procurement and Construction (EPC) Contractor has been selected and were given the notice to proceed in January 2025. At the time of the appraisal, topographical and pullout surveys were being undertaken and the project is expected to be operational by end May 2026.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Egypt

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Solar, Waste Processing and Treatment, Energy Storage, Power Transmission, Road, Raw Materials, Warehouse, Power Generation (CCGT), Biomass, Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project