Abydos Solar Project Battery Energy Storage System
Sector: Solar • Location: Aswan Governate, Egypt
Source: Energy-Storage.News
AMEA Power has completed commissioning of the first large-scale battery energy storage system (BESS) in Egypt, a 300MWh BESS at its 500MW Abydos Solar Project. The BESS is designed to time shift solar-generated energy for use during evening peak hours and is integrated into a 25-year solar power purchase agreement with the Egypt Electricity Transmission Company.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | AMEA Power has completed commissioning of the first large-scale battery energy storage system (BESS) in Egypt, a 300MWh BESS at its 500MW Abydos Solar Project. The BESS is designed to time shift solar-generated energy for use during evening peak hours and is integrated into a 25-year solar power purchase agreement with the Egypt Electricity Transmission Company. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
