AC Hotel by Marriott - Parking Garage
Sector: Metal • Location: Denver, Colorado, United States of America
Source: Dodge USA
NEW 12-STORY HOTEL BUILDING AC MARRIOTT AT CHERRY CREEK 3737 E. DAKOTA AVENUE Twelve Story 153 guest room Hotel building with ground level lobby/lounge/dining amenity space, 4 levels of concrete parking deck, with 7 levels of guest rooms of cold formed metal framing. This permit includes work for a warm dark shell construction and does not include an interior finish package. Interior package will
- Status
- Prospective
- Sector
- Metal, Consumer Products, Commercial, Hotel, Cement, Raw Materials, Car parking, Automotive
- Location
- Denver, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AC Hotel by Marriott - Parking Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NEW 12-STORY HOTEL BUILDING AC MARRIOTT AT CHERRY CREEK 3737 E. DAKOTA AVENUE Twelve Story 153 guest room Hotel building with ground level lobby/lounge/dining amenity space, 4 levels of concrete parking deck, with 7 levels of guest rooms of cold formed metal framing. This permit includes work for a warm dark shell construction and does not include an interior finish package. Interior package will be submitted at a later date - # of parking stalls & square footage for garage are estimated |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Denver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Consumer Products, Commercial, Hotel, Cement, Raw Materials, Car parking, Automotive |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
