AC Hotel by Marriott at Aspiria Campus
Sector: Metal • Location: Overland Park, Kansas, United States of America
Source: Dodge USA
125 room hotel with outdoor swimming pool and waterfall feature shown on the north side of the hotel, between the back of the building and 115th Street. The hotel is proposed to be constructed with a combination of EIFS, metal panels, and glazing. There is a small amount of tile/stone shown at the entrance of the building.
- Status
- Closed
- Sector
- Metal, Manufacturing (Industrial), Commercial, Car parking, Hotel, Road, Automotive
- Location
- Overland Park, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AC Hotel by Marriott at Aspiria Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 125 room hotel with outdoor swimming pool and waterfall feature shown on the north side of the hotel, between the back of the building and 115th Street. The hotel is proposed to be constructed with a combination of EIFS, metal panels, and glazing. There is a small amount of tile/stone shown at the entrance of the building. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Overland Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Manufacturing (Industrial), Commercial, Car parking, Hotel, Road, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
