AC Hotel By Marriott
Bid results · California · Last reported Oct 2024
Source: Dodge USA
ground-up construction of the AC Hotel located at 550 N. Third Street, Burbank, CA 91502. This hotel will include 196 guestrooms, 6 stories over, and 3 levels of subterranean parking. Framing type contains both CONCRETE , STEEL & WOOD- Light Frame .
- Status
- Closed
- Sector
- Car parking, Commercial, Hotel, Road, Steel, Metal, Cement, Automotive, Manufacturing (Industrial)
- Location
- Burbank, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about AC Hotel By Marriott
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ground-up construction of the AC Hotel located at 550 N. Third Street, Burbank, CA 91502. This hotel will include 196 guestrooms, 6 stories over, and 3 levels of subterranean parking. Framing type contains both CONCRETE , STEEL & WOOD- Light Frame . |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Burbank |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Hotel, Road, Steel, Metal, Cement, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
