Ac Pro Distribution Center Ti
Construction · Arizona · Last reported Jul 2025
Source: Dodge
Scope Text = OWNER HAS LEASED PREVIOUS SHEET METAL FACTORY/WAREHOUSE/DISTRIBUTION CENTER WITH OFFICES TO A NEW TENANT FOR THE OFFICE AND WAREHOUSE USE. DEMOLITION, NEW WILL CALL ROOM, ACCESSIBLE RESTROOM, BREAK ROOM, NEW ELECTRICAL, OFFICE LED LIGHTING UPGRADE, AND CODE COMPLIANCE FOR THE FORKLIFT CHARGING AREA FOR LITHIUM-ION BATTERIES. RACKING UNDER SEPARATE PLAN REVIEW SUBMITTAL AND PERMIT. SEP
- Status
- Under Construction
- Sector
- Energy Storage, Metal, Manufacturing (Industrial), Power Generation (CCGT), Warehouse, Commercial, Residential
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ac Pro Distribution Center Ti
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope Text = OWNER HAS LEASED PREVIOUS SHEET METAL FACTORY/WAREHOUSE/DISTRIBUTION CENTER WITH OFFICES TO A NEW TENANT FOR THE OFFICE AND WAREHOUSE USE. DEMOLITION, NEW WILL CALL ROOM, ACCESSIBLE RESTROOM, BREAK ROOM, NEW ELECTRICAL, OFFICE LED LIGHTING UPGRADE, AND CODE COMPLIANCE FOR THE FORKLIFT CHARGING AREA FOR LITHIUM-ION BATTERIES. RACKING UNDER SEPARATE PLAN REVIEW SUBMITTAL AND PERMIT. SEPARATE PLAN REVIEW AND PERMIT FOR FUTURE FACTORY USE PER PHASE 2 SHOWN. Total Square Feet: 76440 |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Metal, Manufacturing (Industrial), Power Generation (CCGT), Warehouse, Commercial, Residential |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
