AC Transmissao
Sector: Hydro • Location: Brazil
Source: World Bank Group
The Brazilian government, under the power regulator Aneel, awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s North-Eastern Piaui state to the neighboring Ceara state. The project company, Consorcio AC Transmissao, will transmit power through the concessional period of 30 years. The 500 KV and 545 KM line will connect the two states and their generating plant
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Brazilian government, under the power regulator Aneel, awarded a greenfield build, own, and operate contract for a transmission line in Brazil’s North-Eastern Piaui state to the neighboring Ceara state. The project company, Consorcio AC Transmissao, will transmit power through the concessional period of 30 years. The 500 KV and 545 KM line will connect the two states and their generating plants at Teresina II and Fortaleza II. The project also includes the construction of three substations. The AC transmissao project was one of 7 transmission concessions awarded by Aneel in 2003-2004; all lines cover 1,787 km and will include investments of US$614 million. Aneel was prompted to release the bids after Brazil’s National Privatization Council (CND) issued a resolution in June 2003 calling for 7 groups of transmission concessions. The greenfield build, own, and operate contract was awarded by Aneel in late 2003 and signed the concessional agreement in February 2004. The contract was signed by the winning consortium comprising state-owned Companhia Hidro Electrica do Sao Francisco (Chesf – 49 percent) and Alusa (51 percent). The consortium was selected on the basis of offering the lowest transmission tariff. Total project financing of the US$190 million project was provided by the sponsor in October 2004 with the support of regional development bank BNB. The bank provided 300 million real financing for the project. The AC Transmissao project started operations in January 2006. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- BDMG CLIMATE ACTION FL II
- Pocos de Caldas Transmissora de Energia Ltda
- Serra da Mesa Transmissora de Energia S.A.